On 21 October 2026, a delegation from a foam converting manufacturer based in Pakistan visited our Qingdao production facility to inspect and test the TDB-2200 high-end automatic flat cutting machine. The customer supplies PU and EVA foam sheets to footwear, packaging and automotive interior producers, and is currently expanding its splitting capacity to shorten lead times on export orders.
| Item | Detail |
|---|---|
| Country | Pakistan |
| Industry | PU / EVA foam converting and sheet supply |
| Downstream markets | Footwear, packaging, automotive interiors |
| Visit date | 21 October 2026 |
| Equipment evaluated | TDB-2200 high-end automatic flat cutting machine |
| Visit objective | Live cutting trial, thickness verification, delivery schedule review |
The TDB-2200 belongs to our full-servo automatic flat cutter series. It is designed for continuous splitting of foam blocks into precise sheets, with servo control on all main axes and an automatic blade-sharpening system.
| Parameter | Specification |
|---|---|
| Model | TDB-2200 (TDBW series) |
| Control system | Full servo motor control |
| Cutting size | 3000 x 2000 mm, working width up to 2200 mm |
| Cutting height | 10 - 1250 mm |
| Cutting thickness | 0.5 - 100 mm |
| Thickness tolerance | 0.5 - 10 mm: within plus or minus 0.03 - 0.08 mm; 10 - 30 mm: within plus or minus 0.08 - 0.15 mm |
| Blade system | Automatic sharpening, air-cleaning sharpening chamber, integrated lighting |
| Machine weight | 6 t |
| Machine dimensions | L6400 x W5200 x H2450 mm |
| Certification | CE |
| Minimum order | 1 set |
| Delivery time | 35 working days after down payment |
| Payment terms | T/T, L/C |
The delegation spent a full day at the plant. The schedule was built around the customer's actual production questions rather than a general presentation:
The same platform covers several product lines the customer already sells:
For this configuration the production lead time is 35 working days after receipt of the down payment, with shipment arranged from Qingdao port. Machines are packed nude with protective film, while small spare parts travel in wooden cases. We provide an English operation manual, remote commissioning support and an optional on-site installation and training service. A spare band blade and a set of guide components can be included in the first shipment so the customer is not dependent on imported wear parts.
The customer's technical manager commented after the trial: "We compared three suppliers before this trip. What convinced us was seeing the thickness measured on our own material, not on a sample prepared for the demo. The servo control and the automatic sharpening system are what our operators need to keep quality stable across shifts."
Following the visit, we will issue the formal quotation, a factory layout drawing for the 2200 mm working width, and the spare parts list. Once the down payment is confirmed, production is scheduled for shipment in the fourth quarter of 2026, with commissioning planned before the customer's peak season. Inquiries from foam converters in Pakistan and neighbouring markets are welcome for a similar trial at our Qingdao plant or through a live video demonstration.